ELECTRICAL/MECHANICAL OPTIMISATION OF INSTALLED POWER (OVER CAPACITY OPTIMIZATION)

Within the frame of present regulations, it is possible to maximize the annual energy production by installing additional WTGs: this can be done under the condition that nominal electric power which has been given to the international grid cannot exceed the installed capacity that is specified on the license. In order to take the decision on such investment optimum excess installed capacity that keeps WPP's efficiency at a certain value (Capacity Factor) should be determined. TÜRKSOY E.M.D. has recently developed the new software called OCO (OCO: Over Capacity Optimizer) which can assess various wind and operational conditions enabling us to offer consultancy services to determine the optimum additional capacity. This study can be performed both for existing WPPs and the WPPs that are still under development.